The District of Columbia passed a law in July 2011 which prevents out-of-state systems registered after January 31st 2011 from participating in the DC SREC Market.  The market is much more straightforward than other states with a set SACP through 2018. Though it is a small market, with a comparably low requirement, DC SRECs are trading well.

Pricing:
SREC Auction - Auction closing prices history

News:
DC Blog - Starting point for useful information regarding the District of Columbia SREC market

Other States in which Washington, DC facilities are eligible:
None

States Eligible for DC Market: DC
Energy Year: January 1 to December 31
Tracking Platform: GATS
SREC Useful Life: 3 years - a 2010 SREC can be counted towards the 2010, 2011 or 2012 RPS

Solar Requirement: Reaching 2.50% of total electricty generated in 2021

SACP: Fixed at $500 through 2016, declining thereafter

Meter Readings: Facilities less than 10 kW can use estimated generation based on the PV watts calculator. All other facilities must submit monthly meter readings. Systems larger than 10 kW require a revenue grade meter.

Eligibility Begins: Upon date of interconnection or the beginning of the most recent energy year (whichever happens second).

Energy Year RPS Solar Requirement  Projected SRECs Required (MWh) Projected Capacity Required (MW)  SACP
2011 0.40% 46,248 38.5 $500
2012 0.50% 58,677 48.9 $500
2013 0.50% 59,558 49.6 $500
2014 0.60% 72,541 60.5 $500
2015 0.70% 85,901 71.6 $500
2016 0.825% 102,759 85.6 $500
2017 0.98% 123,896 103.2 $350
2018 1.15% 147,569 123.0 $300
2019 1.35% 175,832 146.5 $200
2020 1.58% 208,875 174.1 $200
2021 1.85% 248,237 206.9 $150
2022 2.175% 296,224 246.9 $150
2023 2.5% 345,595 288.0 $50

 

Source: EIA Report "Retail Sales of Electricity by State by Provider" updated 10/1/12. Projected SRECs Required utilizes the most recent EIA electricity data applying an average 1.5% growth rate per forecast year. RPS Solar Requirement is multiplied by forecast total electricity sales to arrive at Projected SRECs Required. Projected Capacity Required is based on a factor of 1,200 MWh generated per MW of installed capacity per year. Projected Capacity Required assumes the amount of capacity needed to be operational all year to meet that year's RPS requirements with only current vintage SRECs.

Useful Links:

DC Client Forms - All the forms necessary to sign up for SRECTrade's EasyREC service
New to Solar? - Getting Started - The nuts and bolts of getting started generating and selling SRECs
DSIRE: DC RPS - Details on the Renewable Portfolio Standard

The image below shows a map of the PJM Region. 

PJM Region Map

 

You need to upgrade your Flash Player