Posts Tagged ‘Washington’

Washington State Considers Changes to Clean Fuel Standard

Posted February 22nd, 2024 by SRECTrade.

The Washington Department of Ecology held a workshop on Thursday to discuss potential rule changes to the state’s Clean Fuel Standard (CFS) which was originally implemented on January 1, 2023. Ecology staff laid out the scope of this rulemaking which is expected to conclude with rule adoption by early 2025. The rulemaking will address the following topics:

  • Sustainable Aviation Fuel (SAF) – align program rules with state legislation passed in 2023 that aims to expand use of SAF.
  • Third-Party Verification – require fuel pathway applications and fuel transaction reports to be verified by accredited verification bodies. Ecology is looking to mirror similar programs in California and Oregon, where both programs are proposing to expand existing verification requirements to include EV charging. Ecology did not clarify whether verification would be required for EVs during the workshop.
  • Expand ZEV infrastructure applicability – current rules allow for certain public fast-charging and hydrogen refueling stations to generate CFS credits based in part on station fueling capacity and not solely on the quantity of fueling. Ecology is considering expanding the current rules to allow for medium and heavy-duty infrastructure to be eligible as well. The California Air Resources Board has proposed a similar expansion of ZEV infrastructure crediting for their Low Carbon Fuel Standard. Ecology also indicated that the current ZEV infrastructure program will soon be implemented.
  • Book-and-claim accounting – Ecology staff propose to update accounting methods for biomethane and electricity.

Ecology clarified that changes to carbon intensity targets and program participation fees would not be considered during this rulemaking.

Public comments from this initial workshop may be submitted by March 24. Ecology will schedule additional workshops in the spring and begin publishing draft rules this summer. Ecology aims to hold a public hearing to consider rule changes in the fall or winter.

DC and MD SREC Market Update Webinar Posted

Posted May 8th, 2014 by SRECTrade.

SRECTrade hosted a webinar on Tuesday, 5/6/2014, outlining the DC and Maryland SREC markets. A recording of the webinar is available by clicking the image below.

A link to a PDF of the presentation can be found here.

Solar Capacity in the SREC States – December 2010

Posted January 5th, 2011 by SRECTrade.

SRECTrade SREC Markets Report: December 2010

The following post outlines the megawatts of solar capacity certified and/or registered to create SRECs in the SREC markets SRECTrade currently serves.

PJM Eligible Systems

As of the end of December, there were 11,241 solar PV (11,015) and solar thermal (226) systems registered and eligible to create SRECs in the PJM Generation Attribute Tracking System registry. Of these eligible systems, 35 (~0.3%) have a nameplate capacity of 1 megawatt or greater, of which only 3 systems are greater than 5 MW. The largest system, currently located in Ohio, is 12 MW,  and the second largest, located in Chicago and eligible for the PA and DC markets, is 10 MW. The third largest system, located in NJ, is 5.6 MW.

Massachusetts DOER Qualified Projects

As of December 10, 2010, there were 180 MA DOER qualified solar projects; 156 operational and 24 not operational. Of these qualified systems, 9 (~5.0%) have a nameplate capacity of 1 megawatt or greater, of which only 2 are between 1.5 and 2 MW. None of the projects greater than 1 MW are currently operational.

Capacity Summary By State

The tables below demonstrate the capacity breakout by state. Note, that for all PJM GATS registered projects, each state includes all projects certified to sell into that state. State RPS programs that allow for systems sited in other states to participate have been broken up by systems sited in state and out of state. For example, PA In State includes projects eligible to sell into the PA SREC market as well as projects that may also be eligible to sell into OH and DC. PA Out of State includes systems sited in states with their own state SREC market (i.e. DE) as well as systems sited in states that have no SREC market (i.e. VA). Also, it is important to note that the Current Capacity represents the total megawatts eligible to produce and sell SRECs as of the noted date, while the Estimated Required Capacity – Current and Next Reporting Year represents the estimated number of MW that need to be online on average throughout the reporting period to meet the RPS requirement within each state. For example, New Jersey needs approximately 255 MW online for the entire 2011 reporting year to meet the RPS requirement. Additionally, the data presented below does not include projects that are in the pipeline or currently going through the registration process in each state program. This data represents specifically the projects that have been approved for the corresponding state SREC markets to date.

Dec JPEG Image updated

Subscribe